We architect and deploy the foundational infrastructure your application needs to perform. Our focus is on reliability, security, and developer experience, ensuring your team can build on a robust foundation without managing complex node operations.
Move Language dApp Testnet Integration
Blockchain Infrastructure Development
Build and scale secure, high-performance blockchain backends tailored for Web3 applications.
- Custom RPC Nodes: Dedicated
Ethereum,Polygon, andSolananodes with 99.9% uptime SLA and advanced indexing. - Smart Contract Tooling: Automated deployment pipelines, upgradeable contract frameworks, and real-time monitoring.
- Data Infrastructure: High-performance indexers for on-chain events and subgraphs, delivering sub-second query latency.
We handle the heavy lifting of blockchain infrastructure so you can focus on product innovation and user growth.
Core Integration & Testing Capabilities
We deliver production-ready Move-based dApps with comprehensive testing and integration, ensuring security, performance, and seamless deployment to Aptos and Sui testnets.
Move Language Smart Contract Development
We architect and develop custom Move modules (smart contracts) for Aptos and Sui, leveraging the language's inherent safety features like resource-oriented programming and formal verification to eliminate common vulnerabilities.
Multi-Chain Testnet Integration
We handle full integration with Aptos Devnet/Testnet and Sui Devnet/Testnet, including faucet management, transaction submission, and state synchronization, so you can validate your dApp in a live environment.
SDK & Frontend Integration
We integrate your Move smart contracts with TypeScript/JavaScript SDKs (Aptos SDK, Sui TypeScript SDK) and frontend frameworks (React, Next.js), providing a complete, wallet-connected application for user testing.
Performance & Load Testing
We simulate real-user load on testnets to benchmark transaction throughput (TPS), latency, and gas costs, providing optimization recommendations to ensure your dApp scales under production conditions.
Deployment Pipeline & DevOps
We establish CI/CD pipelines for automated building, testing, and deployment of Move packages to testnets, incorporating security checks and version management for streamlined team development.
Why Dedicated Move Testnet Integration Matters
Generic testnets lack the specialized tooling and environment needed for secure, production-ready Move applications. Our dedicated integration ensures your dApp is battle-tested for the Aptos and Sui mainnets.
Protocol-Specific Environment
We deploy your dApp on a dedicated, isolated testnet mirroring the exact configuration, consensus rules, and gas models of the target mainnet (Aptos or Sui). This eliminates "it works on my machine" failures during final deployment.
Advanced Move Tooling Suite
Access to Move Prover for formal verification, Move Analyzer for linting, and custom transaction generators for edge-case testing. We integrate these tools directly into your CI/CD pipeline for automated security checks.
Real-World Load & Economic Simulation
Simulate mainnet conditions with configurable transaction loads, validator churn, and tokenomics stress tests. Validate your dApp's performance and fee economics under realistic peak demand before launch.
Security-First Testing Framework
Our testing goes beyond unit tests to include adversarial scenario simulation, reentrancy checks for Move resources, and invariant testing specific to the Move VM. We build on OpenZeppelin's Move security patterns.
Faster Mainnet Readiness
Eliminate weeks of environment debugging and configuration drift. With a production-mirrored testnet, your final audit and mainnet deployment cycle is streamlined, reducing time-to-market by over 60%.
Dedicated Infrastructure & Support
Get a private RPC endpoint, block explorer, and faucet with 99.9% uptime SLA. Our Move experts provide direct support for debugging complex Move bytecode and transaction lifecycle issues.
Typical Engagement Timeline & Deliverables
A structured breakdown of our service packages, detailing the scope, timeline, and key deliverables for integrating your Move-based dApp onto a testnet.
| Deliverable / Milestone | Starter (4-6 Weeks) | Professional (6-8 Weeks) | Enterprise (8-12 Weeks) |
|---|---|---|---|
Initial Architecture & Planning | |||
Move Smart Contract Review & Optimization | Basic | Comprehensive | Comprehensive + Audit |
Testnet Selection & Configuration | Single Chain (e.g., Aptos) | Multi-Chain (Aptos & Sui) | Custom Chain Setup |
dApp Integration & Deployment | Core Functions | Full Feature Set | Full Set + Custom Modules |
Security & Performance Testing | Standard Test Suite | Extended Penetration Tests | Full Audit & Formal Verification |
Monitoring & Analytics Dashboard | Basic Metrics | Advanced Alerts & Logs | Custom Dashboards & SLA Monitoring |
Team Knowledge Transfer | Documentation | Documentation + 2 Sessions | Documentation + Ongoing Support |
Post-Launch Support | 30 Days | 90 Days | 12 Months SLA |
Estimated Investment | $25K - $40K | $60K - $100K | Custom Quote |
Our Move-Specific Delivery Methodology
A battle-tested, four-phase process designed to deliver secure, production-ready Move dApps from testnet to mainnet with zero surprises.
Architecture & Security Blueprint
We begin with a comprehensive threat model and security-first architecture review for your Move modules. This includes defining resource boundaries, capability patterns, and formal verification requirements to prevent reentrancy and spoofing attacks specific to the Move VM.
Deterministic Testnet Deployment
Automated deployment of your Move packages to a dedicated, instrumented testnet (Aptos Devnet/Testnet, Sui Devnet/Testnet). We configure full-stack observability, including Move VM execution traces and on-chain state change monitoring from day one.
Mainnet Readiness & Handoff
Final security audit review, gas optimization report, and production deployment orchestration. We provide complete documentation, including module ABIs, upgrade governance procedures, and a 30-day post-launch monitoring period to ensure stability.
Move Testnet Integration FAQs
Common questions from CTOs and engineering leads about integrating with Move-based testnets like Aptos and Sui.
A typical end-to-end deployment to a Move testnet (Aptos Devnet/Sui Devnet) takes 2-4 weeks. This includes environment setup, custom module development, integration testing, and final deployment. For a simple token or basic smart contract, delivery can be as fast as 10 business days. Complex DeFi protocols or NFT marketplaces with custom logic require the full timeline.
Get In Touch
today.
Our experts will offer a free quote and a 30min call to discuss your project.