We architect, develop, and deploy custom Solidity/Rust smart contracts that are secure by design. Our process integrates formal verification and comprehensive audits to eliminate vulnerabilities before mainnet deployment.
Smart Contract Blue-Green Deployment
Custom Smart Contract Development
Secure, production-ready smart contracts built by experts for your Web3 application.
Deliver a battle-tested, gas-optimized foundation for your protocol in 4-6 weeks.
- Token Systems: Custom
ERC-20,ERC-721,ERC-1155with advanced features like vesting, staking, and governance. - DeFi Primitives: Automated Market Makers (AMMs), lending/borrowing pools, yield aggregators, and derivative contracts.
- Enterprise Logic: Multi-signature wallets, supply chain tracking, and custom business logic with 99.9% uptime SLAs.
We provide full documentation, deployment scripts, and post-launch monitoring, ensuring your contracts perform as intended from day one.
How Our Blue-Green Deployment Works
Our battle-tested process eliminates deployment risk for mission-critical smart contracts, ensuring seamless upgrades and instant rollback capabilities.
Parallel Environment Setup
We deploy the new contract version (Green) alongside the live one (Blue) in an isolated, fully-tested environment. This allows for exhaustive security and functional validation without touching production traffic.
Automated Security & Load Testing
Every new contract undergoes automated testing against the latest attack vectors and simulated mainnet load. We integrate tools like Slither and Foundry for fuzzing before any user interaction.
Controlled Traffic Migration
Using proxy patterns or router contracts, we gradually shift a percentage of user transactions to the new version. We monitor real-time metrics for gas usage, errors, and performance.
Instant Rollback on Anomaly
If any anomaly is detected—unexpected revert, gas spike, or failed invariant—we automatically revert 100% of traffic to the stable Blue contract in under one second, guaranteeing service continuity.
Final Cutover & Blue Environment Update
After successful validation at 100% traffic, we finalize the cutover. The new contract becomes the primary (Blue), and the old version is archived as the new rollback (Green) target, completing the cycle.
Post-Deployment Monitoring & Verification
We provide 24/7 monitoring for the new production contract, tracking key health indicators and on-chain events for 14 days post-deployment to ensure long-term stability.
Business Outcomes: Reduce Risk, Increase Velocity
Our Smart Contract Blue-Green Deployment service delivers measurable improvements in security, speed, and operational efficiency for your Web3 product.
Zero-Downtime Upgrades
Deploy new contract versions without disrupting user activity or halting protocol operations. Seamlessly redirect traffic from the old (blue) environment to the new (green) one.
Instant Rollback Capability
If a critical bug is detected post-deployment, instantly revert all traffic to the previous, stable version. Eliminates the risk of prolonged exposure and financial loss.
Comprehensive Pre-Production Testing
Validate new contracts against real mainnet state and traffic patterns in a staging environment identical to production before cutting over.
Reduced Deployment Risk & Cost
Mitigate the high cost of failed deployments and emergency patches. Our structured process prevents costly on-chain migrations and protects your treasury.
Accelerated Release Cycles
Ship features and fixes with confidence. A reliable, automated deployment pipeline reduces manual overhead and cuts your time-to-market for critical updates.
Manual Deployment vs. Chainscore Blue-Green
A detailed comparison of the costs, risks, and operational overhead of managing blue-green deployments internally versus using Chainscore's managed service.
| Deployment Factor | Manual In-House Process | Chainscore Managed Service |
|---|---|---|
Time to Initial Deployment | 3-6 months (team build-up, tooling) | 2-4 weeks (onboarding & configuration) |
Security & Audit Overhead | High (requires dedicated audit budget & time) | Built-in (pre-audited patterns & continuous monitoring) |
Infrastructure Complexity | High (managing RPC nodes, explorers, CI/CD) | Zero (fully managed, single API endpoint) |
Rollback & Canary Testing | Manual, error-prone scripts | One-click rollback & automated canary analysis |
Multi-Chain Deployment Sync | Manual per chain, high coordination risk | Automated, atomic deployments across all chains |
Team Resource Allocation | 2-3 senior engineers full-time | Your team focuses on product, not ops |
Mean Time to Recovery (MTTR) | Hours to days (manual investigation) | < 15 minutes (automated detection & rollback) |
Total Annual Cost (Engineering + Ops) | $300K - $600K+ | Starting at $75K/year (predictable pricing) |
Compliance & Proof Generation | Manual reporting, high audit risk | Automated audit trails & compliance proofs |
Our Delivery Process: From Assessment to Automation
A proven, four-phase framework designed to deliver secure, reliable, and automated smart contract deployments with zero downtime. We move from initial assessment to full CI/CD automation, ensuring your project launches on time and operates with enterprise-grade resilience.
1. Infrastructure & Risk Assessment
We conduct a comprehensive audit of your existing deployment pipeline and smart contract architecture. This phase identifies single points of failure, gas inefficiencies, and security vulnerabilities before a single line of code is written.
Deliverables: Architecture review report, risk matrix, and a prioritized action plan.
2. Blue-Green Architecture Design
Our engineers design a custom blue-green deployment strategy tailored to your protocol (e.g., upgradeable proxies, diamond patterns). We define the cutover logic, state migration paths, and rollback procedures to eliminate deployment risk.
Deliverables: Technical design specification, network topology, and rollback playbook.
3. Secure Implementation & Testing
We build and rigorously test the deployment infrastructure. This includes creating staging environments, writing comprehensive integration tests for cutover scenarios, and conducting security audits focused on the deployment mechanism itself.
Deliverables: Deployed staging environment, test suite, and a security audit summary from our internal review.
4. CI/CD Pipeline Automation
We automate the entire blue-green deployment process into your existing CI/CD workflow (e.g., GitHub Actions, GitLab CI). This includes automated testing, one-click deployments, and real-time health checks for seamless, repeatable production releases.
Deliverables: Fully automated pipeline, operational runbooks, and 30 days of post-launch monitoring support.
Smart Contract Blue-Green Deployment: FAQs
Get clear answers on how our zero-downtime deployment service works, from security to pricing and support.
A standard deployment with a single smart contract and basic testing suite takes 2-3 weeks from kickoff to mainnet launch. Complex protocols with multiple interdependent contracts, custom oracles, and extensive integration testing typically require 4-6 weeks. We provide a detailed project plan with weekly milestones after the initial technical scoping call.
Get In Touch
today.
Our experts will offer a free quote and a 30min call to discuss your project.